Who approves the septic side
Jackson County's building FAQ says septic systems in the county are regulated by Oregon DEQ, through its office at 221 Stewart Ave. in Medford. So an ADU on septic needs two approvals: the county or city for zoning and the building permit, and DEQ for the wastewater. The county's development checklist ties them together: no dwelling may be occupied until it has passed final inspection and, if it is on septic, DEQ has approved it.
First, check that an ADU is allowed
DEQ's ADU fact sheet (November 2025) puts this step first: confirm with your planning department that an ADU is allowed on the property. For unincorporated Jackson County, the rules are in Chapter 6 of the Land Development Ordinance, added by Ordinance 2024-6, effective November 25, 2024. ADUs are reviewed as a Type 1 permit.
- Inside an urban growth boundary: allowed where detached single-family homes are allowed, one ADU per detached home, no more than 900 square feet of usable floor area, and no farther than 100 feet from the existing house.
- Outside an urban growth boundary and urban reserve: only in the RR-00, RR-2.5, RR-5, RR-5(A) and RR-10 rural residential zones, on a lot of at least two acres with only one detached house, the same 900-square-foot and 100-foot limits, fire-equipment access, and a recorded deed declaration that neither home will be used for vacation occupancy.
Cities run their own planning rules, so ask the city if you are inside one. The 100-foot limit matters for septic: the ground near a rural house is often where the tank, drainfield and replacement area sit, so plan the ADU site and the septic layout together. Our Oregon septic setbacks guide lists the distances DEQ checks.
How much sewage DEQ counts
Sizing starts with flow. These figures come straight from DEQ's fact sheet:
| Item | DEQ figure | Source |
|---|---|---|
| Projected daily sewage flow for one ADU | 300 gallons per day | DEQ ADU fact sheet, Checked Oct 12, 2026 |
| Design flow, home with up to 4 bedrooms plus an ADU | 750 gallons per day | DEQ ADU fact sheet, Checked Oct 12, 2026 |
| Added flow an authorization notice can cover | Up to 300 gallons per day or 50% of the system's design capacity, whichever is smaller | DEQ ADU fact sheet, Checked Oct 12, 2026 |
| ADU size limit (state) | No more than two bedrooms | DEQ ADU fact sheet, Checked Oct 12, 2026 |
| How long an authorization notice is valid | One year | DEQ residential permitting, Checked Oct 12, 2026 |
DEQ figures. Your system's design capacity is on its permit records; DEQ's fact sheet says not every property on septic can handle an ADU's extra flow.
Sharing the main home's system
If the ADU will drain into the house's system, start with an authorization notice. Oregon's rule, OAR 340-071-0205, says nobody may connect to, change the use of, or increase the sewage flow into an existing system without one or the right permit.
The application needs a signed Land Use Compatibility Statement from planning, a property development plan, and a description of the existing system. An onsite specialist then visits to check that the system is in good working order, that there is room for future replacement areas for both dwellings, and that the added flow is within the limits above. If any part of the system has to change, an alteration permit is needed. If the added flow is over the limit, DEQ says you will need a site evaluation and a construction-installation permit.
Giving the ADU its own system
A standalone system for the ADU starts with a site evaluation. DEQ says the property needs space for the ADU system's initial and replacement areas plus a replacement area for the main home. If the house has no recorded replacement area, or it has been damaged, at least one test pit will be dug. After the site evaluation is approved, you apply for the permit with the land use statement and system plans.
On a vacant lot, DEQ gives two routes: one site evaluation for 750 gallons a day if a home of up to four bedrooms and the ADU will share a system, or two separate evaluations. DEQ's residential page says permits are usually issued within 20 days of a complete application. For systems used on difficult soils, see septic system types in Oregon.
Adding a bedroom or a guest space instead
DEQ's authorization notice guide says adding bedrooms or apartment facilities to a home generally needs a notice, while extra square footage or a garage that adds no bedrooms usually does not, though planning may still ask for a DEQ land use review. Bedrooms drive septic sizing; see Oregon septic tank size requirements.
Jackson County also allows "detached living space": a building accessory to the home with no combination of living, sleeping, cooking or sanitation provisions that would make it a separate dwelling. It must be within 200 feet of the home and use the home's septic or sewer. Ask planning which category your project fits.
DEQ fees for 2026
DEQ's 2026 fee rule raised onsite fees 33% from July 2026, so older fee figures online are likely low. The current table:
| Item | Fee or price | Source |
|---|---|---|
| Authorization notice, field visit required | $1,029 | DEQ fee tables, Checked Oct 12, 2026 |
| Authorization notice, no field visit required | $263 | DEQ fee tables, Checked Oct 12, 2026 |
| Site evaluation, single-family dwelling, first lot | $1,121 | DEQ fee tables, Checked Oct 12, 2026 |
| Minor alteration permit | $434 | DEQ fee tables, Checked Oct 12, 2026 |
| Major alteration permit | $909 | DEQ fee tables, Checked Oct 12, 2026 |
| DEQ department surcharge | $159 | DEQ fee tables, Checked Oct 12, 2026 |
| New conventional system, installed (national) | $3,500 – $8,500 | HomeGuide, septic system cost, Checked Oct 12, 2026 |
| 1,000-gallon tank alone (national) | $1,000 – $1,500 | HomeGuide, septic system cost, Checked Oct 12, 2026 |
The DEQ rows are Oregon application fees, not construction prices. The last two rows are HomeGuide national figures, not Rogue Valley quotes. For local context, see our septic system cost in Oregon guide.
Getting the existing system ready
DEQ suggests talking to a local septic professional before you apply, to review the size and condition of the existing system. Records help: our guide to finding septic records in Jackson County shows how to look up the permit by parcel number.
For the site visit, DEQ's guide says to call DEQ before uncovering anything if the system has a Certificate of Satisfactory Completion. Otherwise, uncover the tank lids without removing them, the inlet and outlet connections and the distribution boxes, and stake the trench ends. Our guide to finding the septic tank lid covers the probing.
How to apply
DEQ takes Jackson County septic applications only through Oregon e-Permitting, not by email, mail or in person; contact the Medford office if you need an accommodation. Applications missing fees or exhibits are incomplete. The county's checklist says a building permit needs sanitation approval before it can be issued, so the DEQ step comes early, and the pipe from the house to the tank needs a county plumbing permit. More in our Jackson County septic permit guide.
Get the septic side checked
Before you commit to an ADU, know the tank size, its condition and where the drainfield runs. Call (541) 326-4526 or use the form, and we will pass the request to an independent local septic crew. Tell us whether the ADU will share the main system, how many bedrooms each building will have, and whether you have DEQ records. See also septic inspections and septic camera inspection.
Sources
- Oregon DEQ, ADUs and Onsite Wastewater Treatment (Septic) Systems fact sheet (Nov. 2025, PDF) (Checked Oct 12, 2026)
- Oregon DEQ, Authorization Notice Guide for Septic Systems (PDF) (Checked Oct 12, 2026)
- Oregon DEQ, Residential Septic Permitting (Curry, Jackson and Josephine counties) (Checked Oct 12, 2026)
- OAR 340-071-0205, Authorization to Use Existing Systems (OregonLaws copy of the rule text) (Checked Oct 12, 2026)
- Oregon DEQ, Division 71 Onsite Fee Tables, OAR 340-071-0140 (effective July 1, 2026) (Checked Oct 12, 2026)
- Oregon DEQ, Water Quality Fees 2026 adopted rules (Checked Oct 12, 2026)
- Jackson County Land Development Ordinance, Chapter 6, ADU standards (PDF) (Checked Oct 12, 2026)
- Jackson County Building Division, frequently asked questions (Checked Oct 12, 2026)
- Jackson County Development Services, Development Checklist (PDF) (Checked Oct 12, 2026)
- HomeGuide, septic system cost (national figures) (Checked Oct 12, 2026)
Common questions
Can an ADU share a septic system in Oregon?
Yes, if the system can handle it. DEQ's ADU fact sheet says an ADU may share the main home's system after an authorization notice, when the system is in good working order, there is room for replacement areas, and the added flow is within DEQ's limits.
How many gallons per day does DEQ count for an ADU?
DEQ's fact sheet uses 300 gallons per day for an ADU, and 750 gallons per day for a home with up to four bedrooms plus an ADU.
Do I need a new septic system for an ADU?
Not always. If the added flow is more than 300 gallons a day or 50% of the system's design capacity, whichever is smaller, DEQ says a site evaluation and a construction-installation permit are required.
How much is a DEQ authorization notice?
DEQ's fee table effective July 1, 2026 lists $1,029 when a field visit is required and $263 when it is not, plus a $159 department surcharge listed separately.
Can I build a rural ADU in Jackson County?
In some rural residential zones. The county ordinance requires a lot of at least two acres with one detached house, an ADU of no more than 900 square feet within 100 feet of the house, and a recorded no-vacation-rental declaration.